6 - WORKING OPERATIONS
Remove anchors from storage hooks
Before placing the bag onto the tunnel, the two anchors
have to be removed from the storage hooks.
1. Remove the clips and pins
(1)
holding the cable guides
(2)
in the up position. Store pins inside cab while bag-
ging.
2. Remove the clips
(3)
from the welded pin
(4)
and lower
the guides down. Secure in the lowered position with
the clips
(3)
.
3. Remove the anchors
(5)
from the hooks
(6)
and posi-
tion in front of the tunnel.
RAIL16GEN0251BA
1
4. Return to the cab, sound the horn, start the engine
and use the anchor in/out switch
(1)
on the right side
console to retract both anchors
(2)
. Retract both of
them all the way in to the guides
(3)
.
RAIL16GEN0028AA
2
RAIL16GEN0128AA
3
6-32
Summary of Contents for LX1214
Page 8: ......
Page 11: ...1 GENERAL INFORMATION Your machine RAIL16SP00177FA 1 Ag Bag silage bagger 1 3 ...
Page 28: ...2 SAFETY INFORMATION California proposition 65 warning BT09A213 1 2 10 ...
Page 32: ...2 SAFETY INFORMATION RAIL16SP00182FA 3 RAIL16SP00183FA 4 2 14 ...
Page 94: ...4 OPERATING INSTRUCTIONS 4 10 ...
Page 158: ...6 WORKING OPERATIONS 6 52 ...
Page 260: ...7 MAINTENANCE 7 102 ...
Page 270: ...8 TROUBLESHOOTING 8 10 ...
Page 272: ...9 SPECIFICATIONS 9 2 ...