6 - WORKING OPERATIONS
13. Under the tunnel assemble the 3/4-10 x 3 flange bolts
between the tunnel and the frame. Secure in place
with 3/4-10 nylok nuts. Tighten securely.
RAIL16GEN0091AA
3
RAIL16GEN0093AA
4
14. Place the anchor cables
(1)
around the cable pulleys
(2)
under the tunnel and insert the retainer pin
(3)
next
to the pulley.
RAIL16GEN0091AA
5
15. After the tunnel is in place on the frame insert the
nine button head bolts
(1)
that is used to secure the
tunnel floor
(2)
to the frame. Insert the bolts from the
top down and secure in place with the nuts on the
underside.
RAIL16GEN0092AA
6
6-6
Summary of Contents for LX1214
Page 8: ......
Page 11: ...1 GENERAL INFORMATION Your machine RAIL16SP00177FA 1 Ag Bag silage bagger 1 3 ...
Page 28: ...2 SAFETY INFORMATION California proposition 65 warning BT09A213 1 2 10 ...
Page 32: ...2 SAFETY INFORMATION RAIL16SP00182FA 3 RAIL16SP00183FA 4 2 14 ...
Page 94: ...4 OPERATING INSTRUCTIONS 4 10 ...
Page 158: ...6 WORKING OPERATIONS 6 52 ...
Page 260: ...7 MAINTENANCE 7 102 ...
Page 270: ...8 TROUBLESHOOTING 8 10 ...
Page 272: ...9 SPECIFICATIONS 9 2 ...