6 - WORKING OPERATIONS
14 ft tunnel removal
RAIL16GEN0272FA
49
Item
Description
1
Tunnel support plate
Start the engine and lower the bag pan all the way down.
Use the bag boom to remove the tunnel extension from
the tunnel. Set the tunnel extension out of the way. Save
all items for reassembly.
1. Securely attach the overhead crane
(1)
to the flip up
loop
(2)
on the top of the tunnel. Do not attach the
overhead crane to any other point on the tunnel. Put
a slight tension on the overhead crane, but not to the
point that the tunnel starts to lift.
RAIL16GEN0088AA
50
2. Remove the anchors
(1)
from the anchor cable
(2)
by
removing the two piece cable retainers
(3)
on each
side of the anchor. Save all items for reassembly.
RAIL16GEN0089AA
51
6-19
Summary of Contents for LX1214
Page 8: ......
Page 11: ...1 GENERAL INFORMATION Your machine RAIL16SP00177FA 1 Ag Bag silage bagger 1 3 ...
Page 28: ...2 SAFETY INFORMATION California proposition 65 warning BT09A213 1 2 10 ...
Page 32: ...2 SAFETY INFORMATION RAIL16SP00182FA 3 RAIL16SP00183FA 4 2 14 ...
Page 94: ...4 OPERATING INSTRUCTIONS 4 10 ...
Page 158: ...6 WORKING OPERATIONS 6 52 ...
Page 260: ...7 MAINTENANCE 7 102 ...
Page 270: ...8 TROUBLESHOOTING 8 10 ...
Page 272: ...9 SPECIFICATIONS 9 2 ...