6 - WORKING OPERATIONS
6. Remove the seven 3/4” bolts from under the tunnel.
These bolts hold the tunnel to the frame. Four are
on the cab end
(1)
of the tunnel and three are on the
engine end
(2)
of the tunnel. Save the hardware for
reassembly.
RAIL16GEN0093AA
55
RAIL16GEN0091AA
56
7. Remove the guard
(1)
from the planetary end of the
rotor on the feed table side. This is to access the three
allen flat head bolts
(2)
(in line with the rotor) that hold
the tunnel to the frame. Remove all three bolts. Save
all hardware for reassembly. Early production had flat
head bolts,
(2)
current production has hex head bolts
(3)
.
RAIL16GEN0095AA
57
RAIL16GEN0096AA
58
6-21
Summary of Contents for LX1214
Page 8: ......
Page 11: ...1 GENERAL INFORMATION Your machine RAIL16SP00177FA 1 Ag Bag silage bagger 1 3 ...
Page 28: ...2 SAFETY INFORMATION California proposition 65 warning BT09A213 1 2 10 ...
Page 32: ...2 SAFETY INFORMATION RAIL16SP00182FA 3 RAIL16SP00183FA 4 2 14 ...
Page 94: ...4 OPERATING INSTRUCTIONS 4 10 ...
Page 158: ...6 WORKING OPERATIONS 6 52 ...
Page 260: ...7 MAINTENANCE 7 102 ...
Page 270: ...8 TROUBLESHOOTING 8 10 ...
Page 272: ...9 SPECIFICATIONS 9 2 ...