6 - WORKING OPERATIONS
3. Remove the bolt
(1)
holding the anchor supports
(2)
with rollers from the tunnel. Save all hardware for re-
assembly.
RAIL16GEN0090AA
52
4. Pull the two anchor cables
(1)
through the pulleys
(2)
under the tunnel floor. Remove the cable retainer pin
(3)
next to the pulley. Save the pin for reassembly.
RAIL16GEN0091AA
53
5. Remove the 9 button head bolts
(1)
(located behind
the clean out plate) securing the tunnel floor
(2)
to
the frame. Save the button head bolts and nuts for
reassembly.
RAIL16GEN0092AA
54
6-20
Summary of Contents for LX1214
Page 8: ......
Page 11: ...1 GENERAL INFORMATION Your machine RAIL16SP00177FA 1 Ag Bag silage bagger 1 3 ...
Page 28: ...2 SAFETY INFORMATION California proposition 65 warning BT09A213 1 2 10 ...
Page 32: ...2 SAFETY INFORMATION RAIL16SP00182FA 3 RAIL16SP00183FA 4 2 14 ...
Page 94: ...4 OPERATING INSTRUCTIONS 4 10 ...
Page 158: ...6 WORKING OPERATIONS 6 52 ...
Page 260: ...7 MAINTENANCE 7 102 ...
Page 270: ...8 TROUBLESHOOTING 8 10 ...
Page 272: ...9 SPECIFICATIONS 9 2 ...