6 - WORKING OPERATIONS
16. Assemble the anchor supports
(1)
with pivot bolts
(2)
to the tunnel.
RAIL16GEN0090AA
7
17. Assemble the anchors to the anchor cables using the
two piece anchor retainers
(1)
. Tighten securely to
hold the retainer halves together.
RAIL16GEN0089AA
8
18. Assemble the hydraulic hoses quick disconnects for
the tunnel clean out plate to the control valve on the
valve plate mounted to the cab side of the tunnel.
Tighten securely.
RAIL16GEN0101AA
9
19. Assemble the engine end hand rail
(1)
to the corner
of the hydraulic oil tank
(2)
at the engine end. Place
the hand rail mounting plate against the hydraulic oil
tank, line up the three mounting holes and insert the
3/8-16 x 1-1/4 stainless steel bolts with 3/8 stainless
steel flat washers
(3)
through the hand rail plate and
then the hydraulic oil tank lip. Secure in place with
3/8 stainless steel flat washers and 3/8-16 stainless
steel nylock nuts. Tighten securely.
RAIL16GEN0110AA
10
6-7
Summary of Contents for LX1214
Page 8: ......
Page 11: ...1 GENERAL INFORMATION Your machine RAIL16SP00177FA 1 Ag Bag silage bagger 1 3 ...
Page 28: ...2 SAFETY INFORMATION California proposition 65 warning BT09A213 1 2 10 ...
Page 32: ...2 SAFETY INFORMATION RAIL16SP00182FA 3 RAIL16SP00183FA 4 2 14 ...
Page 94: ...4 OPERATING INSTRUCTIONS 4 10 ...
Page 158: ...6 WORKING OPERATIONS 6 52 ...
Page 260: ...7 MAINTENANCE 7 102 ...
Page 270: ...8 TROUBLESHOOTING 8 10 ...
Page 272: ...9 SPECIFICATIONS 9 2 ...