6 - WORKING OPERATIONS
11. Assemble the guard
(1)
at the planetary end of the
rotor. Secure in place with the hardware
(2)
saved
from removal. Tighten securely.
RAIL16GEN0095AA
41
12. Line up the seven holes in the frame with the seven
holes under the tunnel. Assemble the saved seven
3/4” bolts from under the tunnel during removal.
These bolts hold the tunnel to the frame. Four are
on the cab end
(1)
of the tunnel and three are on the
engine end
(2)
of the tunnel. Tighten all seven bolts
securely.
RAIL16GEN0093AA
42
RAIL16GEN0091AA
43
13. Behind the clean out plate locate the nine holes
(1)
in the tunnel floor.
(2)
Line up the holes and insert
the nine button head bolts
(3)
saved from removal
through the floor and the frame from the top down.
Secure in place with the nine nuts. Tighten securely.
RAIL16GEN0092AA
44
6-17
Summary of Contents for LX1214
Page 8: ......
Page 11: ...1 GENERAL INFORMATION Your machine RAIL16SP00177FA 1 Ag Bag silage bagger 1 3 ...
Page 28: ...2 SAFETY INFORMATION California proposition 65 warning BT09A213 1 2 10 ...
Page 32: ...2 SAFETY INFORMATION RAIL16SP00182FA 3 RAIL16SP00183FA 4 2 14 ...
Page 94: ...4 OPERATING INSTRUCTIONS 4 10 ...
Page 158: ...6 WORKING OPERATIONS 6 52 ...
Page 260: ...7 MAINTENANCE 7 102 ...
Page 270: ...8 TROUBLESHOOTING 8 10 ...
Page 272: ...9 SPECIFICATIONS 9 2 ...