6 - WORKING OPERATIONS
14 ft tunnel components
RAIL16GEN0272FA
30
Item
Description
1
Tunnel support plate
The following information is for installation of the 14 foot
tunnel
1. Securely attach the overhead crane
(1)
to the flip up
loop
(2)
on the top of the tunnel. Do not attach the
overhead crane to any other point on the tunnel.
RAIL16GEN0088AA
31
2. Use the overhead crane to slowly lift and position the
tunnel
(1)
with clean out door and hydraulic cylinders
on to the frame
(2)
. Leave the overhead crane at-
tached to the tunnel until it is fully assembled to the
frame.
RAIL16GEN0104AA
32
6-14
Summary of Contents for LX1214
Page 8: ......
Page 11: ...1 GENERAL INFORMATION Your machine RAIL16SP00177FA 1 Ag Bag silage bagger 1 3 ...
Page 28: ...2 SAFETY INFORMATION California proposition 65 warning BT09A213 1 2 10 ...
Page 32: ...2 SAFETY INFORMATION RAIL16SP00182FA 3 RAIL16SP00183FA 4 2 14 ...
Page 94: ...4 OPERATING INSTRUCTIONS 4 10 ...
Page 158: ...6 WORKING OPERATIONS 6 52 ...
Page 260: ...7 MAINTENANCE 7 102 ...
Page 270: ...8 TROUBLESHOOTING 8 10 ...
Page 272: ...9 SPECIFICATIONS 9 2 ...