5 - TRANSPORT OPERATIONS
4. Line up the top center pin
(1)
with the receiver bracket
(2)
on the top of the tunnel. Line up the lower pins
(3)
with the hooks
(4)
on the sides of the tunnel. Secure
top in place with the retainer pin and clip
(5)
.
RAIL16GEN0120AA
9
RAIL16GEN0151AA
10
5. Lower the boom arm
(1)
down to the top of the tunnel
extension
(2)
and remove the slack in the cable. The
boom must remain in this position for transport.
RAIL16GEN0152AA
11
5-8
Summary of Contents for LX1214
Page 8: ......
Page 11: ...1 GENERAL INFORMATION Your machine RAIL16SP00177FA 1 Ag Bag silage bagger 1 3 ...
Page 28: ...2 SAFETY INFORMATION California proposition 65 warning BT09A213 1 2 10 ...
Page 32: ...2 SAFETY INFORMATION RAIL16SP00182FA 3 RAIL16SP00183FA 4 2 14 ...
Page 94: ...4 OPERATING INSTRUCTIONS 4 10 ...
Page 158: ...6 WORKING OPERATIONS 6 52 ...
Page 260: ...7 MAINTENANCE 7 102 ...
Page 270: ...8 TROUBLESHOOTING 8 10 ...
Page 272: ...9 SPECIFICATIONS 9 2 ...