6 - WORKING OPERATIONS
7. Line up the nine holes on each side of the tunnel with
the holes in the frame. Assemble the nine bolts
(1)
to each side of the tunnel (between the tunnel support
pipes
(2)
). The bottom four on each side have spacers
to the inside. Be sure to position the spacers between
the tunnel and the frame (spacers not shown) Secure
in place with the hardware saved from removal. Lower
four bolts shown.
RAIL16GEN0099AA
37
8. Assemble the three allen head bolts — early produc-
tion or hex head bolts — current production (saved
from removal) at the driven end of the rotor on the feed
table side. These bolts hold the tunnel to the frame
and are in line with the rotor. Tighten securely.
RAIL16GEN0096AA
38
9. Assemble the guard over the chains at the driven end
of the rotor. Secure in place with the hardware saved
from removal. Tighten securely.
RAIL16GEN0097AA
39
10. Assemble the three allen head bolts — early produc-
tion or hex head bolts — current production (saved
from removal) at the planetary end of the rotor on the
feed table side. These bolts hold the tunnel to the
frame and are in line with the rotor. Tighten securely.
RAIL16GEN0096AA
40
6-16
Summary of Contents for LX1214
Page 8: ......
Page 11: ...1 GENERAL INFORMATION Your machine RAIL16SP00177FA 1 Ag Bag silage bagger 1 3 ...
Page 28: ...2 SAFETY INFORMATION California proposition 65 warning BT09A213 1 2 10 ...
Page 32: ...2 SAFETY INFORMATION RAIL16SP00182FA 3 RAIL16SP00183FA 4 2 14 ...
Page 94: ...4 OPERATING INSTRUCTIONS 4 10 ...
Page 158: ...6 WORKING OPERATIONS 6 52 ...
Page 260: ...7 MAINTENANCE 7 102 ...
Page 270: ...8 TROUBLESHOOTING 8 10 ...
Page 272: ...9 SPECIFICATIONS 9 2 ...