6 - WORKING OPERATIONS
Install tunnel extension on to tunnel
The tunnel extension is stored on the top of the tunnel. Two people are required for this procedure.
1. Attach the bag boom hook
(1)
to the lift eye
(2)
located
at the center of the tunnel extension
(3)
.
RAIL16GEN0119AA
1
2. Remove the clip pin and retainer pin
(1)
holding the
tunnel extension to the bagger. This is the top center
pin
(2)
on the extension.
RAIL16GEN0120AA
2
3. Using the bag boom, swing the tunnel extension out
and lower to a position in front of the tunnel. Line up
the five pins
(1)
on the extension
(2)
with the five re-
ceiver tubes
(3)
on the tunnel. Slide the tunnel exten-
sion pins into the receiver tubes.
4. Secure in place with the pins and clips supplied with
your bagger.
RAIL16GEN0121AA
3
5. Unhook the bag boom
(1)
from the lift eye
(2)
on the
tunnel extension
(3)
.
6. Fold the eye
(2)
down against the tunnel extension to
prevent damage to the bag.
RAIL16GEN0119AA
4
6-27
Summary of Contents for LX1214
Page 8: ......
Page 11: ...1 GENERAL INFORMATION Your machine RAIL16SP00177FA 1 Ag Bag silage bagger 1 3 ...
Page 28: ...2 SAFETY INFORMATION California proposition 65 warning BT09A213 1 2 10 ...
Page 32: ...2 SAFETY INFORMATION RAIL16SP00182FA 3 RAIL16SP00183FA 4 2 14 ...
Page 94: ...4 OPERATING INSTRUCTIONS 4 10 ...
Page 158: ...6 WORKING OPERATIONS 6 52 ...
Page 260: ...7 MAINTENANCE 7 102 ...
Page 270: ...8 TROUBLESHOOTING 8 10 ...
Page 272: ...9 SPECIFICATIONS 9 2 ...