6 - WORKING OPERATIONS
20. Assemble the cab end hand rail
(1)
to the hand rail
(2)
at the cab end of the bagger. This hand rail is
used to fill the gap between the platform hand rail and
the tunnel. Position the handrail next to the platform
hand rail from the tunnel side. Secure the hand rail
to the platform hand rail with four 5/16 x 1-1/2 round
stainless steel u-bolts
(3)
. Place the u-bolts around
the railing tubes and through the mounting plates.
Secure in place with 5/16 stainless steel flat washers
and 5/16-18 stainless steel nylock nuts. Position to fill
as much of the gap as possible and tighten securely.
RAIL16GEN0111AA
11
21. When the tunnel is completely assembled to the bag-
ger, remove the overhead hoist
(1)
from the top of the
tunnel. Be sure to fold the lifting loop
(2)
down against
the tunnel to prevent damage to the bag.
RAIL16GEN0111AA
12
12 ft tunnel removal
When removing the tunnel from the bagger, be sure to have a level area and solid wood blocks to set the tunnel on
once it is removed.
1. Start the engine and lower the bag pan all the way
down. Shut off the engine and remove the key.
RAIL16GEN0087AA
13
2. Remove the tunnel extension from the tunnel. Set the
tunnel extension out of the way. Save all mounting
hardware. Remove the bag cradle from the tunnel.
6-8
Summary of Contents for LX1214
Page 8: ......
Page 11: ...1 GENERAL INFORMATION Your machine RAIL16SP00177FA 1 Ag Bag silage bagger 1 3 ...
Page 28: ...2 SAFETY INFORMATION California proposition 65 warning BT09A213 1 2 10 ...
Page 32: ...2 SAFETY INFORMATION RAIL16SP00182FA 3 RAIL16SP00183FA 4 2 14 ...
Page 94: ...4 OPERATING INSTRUCTIONS 4 10 ...
Page 158: ...6 WORKING OPERATIONS 6 52 ...
Page 260: ...7 MAINTENANCE 7 102 ...
Page 270: ...8 TROUBLESHOOTING 8 10 ...
Page 272: ...9 SPECIFICATIONS 9 2 ...