2 - 40
SPEC
CABLE ROUTING DIAGRAM
1
Coolant reservoir tank
breather hose
2
Clamp
3
Ignition coil
4
High tension cord
5
CDI unit
6
CDI unit band
7
“ENGINE STOP” button
lead
8
Throttle cable (pull)
9
Throttle cable (return)
0
Radiator (left)
A
Radiator (right)
B
Decompression cable
C
CDI unit stay (frame)
Å
Fasten the coolant reservoir tank
breather hose and carburetor
breather hoses together with a
plastic locking tie.
ı
Fasten the ignition coil lead to the
frame with a plastic band.
Ç
Pass the ignition coil lead (in the
sub wire harness) so that it does
not contact the carburetor and
rear shock absorber and connect
it with the lead from the ignition
coil on the inside of the frame.
Î
Fasten the ignition coil and
ground lead to the frame with the
bolt.
‰
Pass the throttle cables over the
high tension cord.
Ï
Pass the throttle cables along the
outer side of the CDI unit leads.
Ì
Fasten the CDI unit leads and
“ENGINE STOP” button lead to
the frame at the protector of the
CDI unit leads with a plastic lock-
ing tie.
Ó
Fit the boot over the coupler.
È
Pass the throttle cables between
the top radiator mounting boss
and middle radiator mounting
boss.
Ô
Pass the CDI unit lead and
“ENGINE STOP” button lead over
the top radiator mounting boss.
Pass the throttle cables and
“ENGINE STOP” button lead
through the cable guide.
Ò
Cross the pull and return throttle
cables before the radiator.
˜
Insert the CDI unit band over the
CDI unit stay (frame) as far as
possible.
Содержание WR426F(P)
Страница 688: ...5 67 CHAS REAR SHOCK ABSORBER 8 Install Band 1 Tail light connector 2 ...
Страница 774: ......
Страница 775: ......