For Service Engineer
Service Information
SI1705004E-00=SIGMA-G5SII Service Manual
45/273
Fig. A38
(8) Open the "Setup" window and then, "MNL XFER" window. Move up the clamp in
the "MNL XFER" window. After moving it up, return the Z-clamp pressure to
previous "0.4Mpa".
(9) Press the [Maint.] button in the operation window and press the [Ship. Adj.] button.
Then, select either [1] or [2] button, or [All] button in the "Select Beam" selection
box in the "PCB Recog/Beam" window.
(10) Select [Use] in the "Glass Jig" selection box.
(11) Select the [Teach Start] button and press the [START] button.
(12) Place the PEC recognition calibration jig onto the upstream side stopper position
manually.
Fig. A39
(13) As the same as on the upstream side, fix the PCB onto the PEC recognition
calibration jig and select the [Teach Start] button and press the [START] button.
(14) Make a note of the values in "Before" and "After" sections.
Then, press the [Save] button to save the data.