For Service Engineer
Service Information
SI1705004E-00=SIGMA-G5SII Service Manual
11/273
1.2. Connection of the Power and Earth Cable
1.2.1. Installation of the Machine Power Unit
Step 1
Remove the six truss head screws fixing the cover.
Note:
Remove carefully the two truss head screws on the upper section, so that any of them does not drop in
the linear section.
Step 2
Set the breaker dial to "OFF" and turn it further to the left to remove the cover.
Caution
Fig. A3-1
Primary Power Breaker Location
Fig. A3-2
Fig. A4-1
Fig. A4-2
Fig. A4-3
OFF
Attachment/Detachment