
Chapter 4
Basic Testing
Running multiple tests
T-BERD/MTS/SC Getting Started Guide
March 2018
22046537, Rev. 016
Page 127
Running multiple tests
To run multiple tests you need to have a dual port unit:
1
Verify that your instrument is powered using the adapter that shipped with it.
2
Start the first test by doing the following:
a
Using the Test menu, select a test application see
b
Configure the test (see
“Step 2: Configuring a test” on page 113
c
Connect the module to the circuit (refer to your instrument’s Getting Started
Manual).
d
Start the test (see
“Step 4: Starting the test” on page 115
3
To run a second test, do the following:
a
Select
Test > Add Test
.
10 Gbps
applications
When running a 10 GigE Ethernet, 10 Gig Fibre Chan-
nel, OC-192, or STM-64 test, you can run one additional
test (at a lower line rate) while operating the instrument
at:
– 32°F to 95°F (0°C to +35°C)
Your battery will not charge while running multiple tests
with one application at a 10 Gbps line rate. For details,
see the section on charging your battery in the Getting
Started Manual that shipped with your instrument or
upgrade.
10 Gbps Packet
Capture
When running a 10 GigE LAN or WAN application, and
capturing data on Port #1, you can not run a 1 GigE
application from Port #2. If you want to run a 1 GigE
application on Port #2, you must first disable packet
capture for the 10 GigE application running on Port #1.
You can run applications for lower line rates (for exam-
ple, 10/100/10000 Mbps Ethernet) on Port #2 when
capturing packets on Port #1 for a 10 GigE application.
NextGen applica-
tions (launched
from the standard
SONET or SDH
test menu)
Additional tests can not be run when running a NextGen
application, and if you are using an MSAM, you must
use the PIM in port 1. You can not run a second test on
port 2, and you can not run NextGen tests from port 2.
MSAMs in 8000
Dual Module
Carrier (DMC)
All
Please contact your local sales office or technical assis-
tance representative for a list of restrictions when run-
ning multiple tests using this assembly.
Table 13
Multiple Test Restrictions
Assembly
Application
Restriction
Содержание T-BERD MTS 5800
Страница 1: ...T BERD MTS SC Getting Started Guide T BERD MTS 5800 5800 100G MSAM CSAM DMC and SC 4800 4800P ...
Страница 2: ......
Страница 294: ...Glossary T BERD MTS SC Getting Started Guide Page 270 22046537 Rev 016 March 2018 ...
Страница 295: ......