
Chapter 3
Getting Started
Setting up the Job Manager
T-BERD/MTS/SC Getting Started Guide
March 2018
22046537, Rev. 016
Page 87
The Pass/Fail status is updated when the report for a planned test item is created. To
associate a report to a planned test item, you need to match the reference information
entered for the current test with the reference information specified in the desired
planned test item.
Selecting the
Create Summary Report
button allows the user to generate a report of
the test plan, including the associated report artifacts and the Pass/Fail status.
Selecting the
Load Job
button allows the user to load a new Job onto the instrument.
Attach a USB stick containing the job file and select
Load Job
to open the file dialog.
Содержание T-BERD MTS 5800
Страница 1: ...T BERD MTS SC Getting Started Guide T BERD MTS 5800 5800 100G MSAM CSAM DMC and SC 4800 4800P ...
Страница 2: ......
Страница 294: ...Glossary T BERD MTS SC Getting Started Guide Page 270 22046537 Rev 016 March 2018 ...
Страница 295: ......