RT-SVX36G-EN
183
Maintenance
Suction Line Filter/Drier
Figure 96. Suction line filter/drier installation
Table 69. Supply and exhaust/return fan VFD programming parameters
Menu
Parameter
Description
Setting
Description
Load & Motor
1-21
Motor Power
Set Based on Motor
Nameplate
Set only for applications using 3hp
motors
Set to 2.2kW/3hp
1-22
Motor Voltage
Set Based on Motor
Nameplate
Set only for 200/230v 60hz & 380/415
50Hz applications
1-24
Motor Current
Set Based on Motor
Nameplate
Sets the motor FLA
1-25
Motor Speed
Set Based on Motor
Nameplate
Sets the motor RPM
Limits & Warnings
215
Current Limit
100% Rated Current Limits the maximum current to motor
Note:
These parameters are motor specific and the actual motor nameplate rating must be used. Do not use the unit name
plate values.
WARNING
Hazardous Voltage w/Capacitors!
Disconnect all electric power, including remote disconnects and discharge all motor start/run
capacitors before servicing. Follow proper lockout/tagout procedures to ensure the power
cannot be inadvertently energized. For variable frequency drives or other energy storing
components provided by Trane or others, refer to the appropriate manufacturer’s literature for
allowable waiting periods for discharge of capacitors. Verify with an appropriate voltmeter that
all capacitors have discharged. Failure to disconnect power and discharge capacitors before
servicing could result in death or serious injury.
For additional information regarding the safe discharge of capacitors, see PROD-SVB06A-EN
.
16 “
min
There is a min. 16" straight distance
from the Tee (Elbow) to anything in this line.
CONDENSER - SUCTION
FILTER / DRIER PLACEMENT
Содержание IntelliPak SAHL Series
Страница 47: ...RT SVX36G EN 47 Installation Figure 16 Unit rigging Figure 17 Typical unit base and roof curb cross section...
Страница 65: ...RT SVX36G EN 65 Installation Figure 30 Hot Water Piping 90 130 Ton Figure 31 Steam Coil Piping 20 36 Ton...
Страница 86: ...86 RT SVX36G EN Installation Figure 38 Field connection diagram notes for 20 89 ton CV or VAV applications...
Страница 87: ...RT SVX36G EN 87 Installation Figure 39 Typical field wiring diagram for 20 89 ton VAV control option 2307 9177...
Страница 88: ...88 RT SVX36G EN Installation Figure 40 Typical field wiring diagram for 20 89 ton VAV control option...
Страница 173: ...RT SVX36G EN 173 Startup Checklists Figure 88 Dry bulb changeover map...
Страница 175: ...RT SVX36G EN 175 Maintenance Figure 89 Unit internal fuse replacement data for air handling units...