RT-SVX36G-EN
99
Unit Start Up
Set Drain Duration Timer
Enter service test mode from unit Human Interface. Navigate to the compressor condenser fan
submenu. Under head pressure control, use manual control.
Close drain valve and energize water inlet solenoid valve until water reaches nominal level. Once
level is achieved, de-energize fill solenoid. Open drain valve and time how long it takes for the water
level to drop one inch, make sure to take into account the closing time of the valve.
Figure 45. Actuator shaft adapter removal/assembly
Figure 46. Actuator is shipped in “drain during power loss” configuration
Locking clip
Shaft adapter
1
2
To drain during power loss,
set shaft adapter to 0 degrees
To hold during power loss,
set shaft adapter to 90 degrees
Содержание IntelliPak SAHL Series
Страница 47: ...RT SVX36G EN 47 Installation Figure 16 Unit rigging Figure 17 Typical unit base and roof curb cross section...
Страница 65: ...RT SVX36G EN 65 Installation Figure 30 Hot Water Piping 90 130 Ton Figure 31 Steam Coil Piping 20 36 Ton...
Страница 86: ...86 RT SVX36G EN Installation Figure 38 Field connection diagram notes for 20 89 ton CV or VAV applications...
Страница 87: ...RT SVX36G EN 87 Installation Figure 39 Typical field wiring diagram for 20 89 ton VAV control option 2307 9177...
Страница 88: ...88 RT SVX36G EN Installation Figure 40 Typical field wiring diagram for 20 89 ton VAV control option...
Страница 173: ...RT SVX36G EN 173 Startup Checklists Figure 88 Dry bulb changeover map...
Страница 175: ...RT SVX36G EN 175 Maintenance Figure 89 Unit internal fuse replacement data for air handling units...