Compressor Crankcase Heaters
20 - 73 and 80 ton units are equipped with 90 watt heaters installed on each compressor. 75 and
89 - 130 ton units are equipped with 160 watt heaters per compressor.
Compressor Operational Sounds
At Low Ambient Start-Up
When the compressor starts up under low ambient conditions, the initial flow rate of the
compressor is low due to the low condensing pressure. Under this condition, it is not unusual to
hear the compressor rattle until the suction pressure climbs and the flow rate increases.
Compressor – Blink Codes
The CSHN*** compressors come equipped with a compressor protection device capable of
detecting phase reversal, phase loss, and phase unbalance. The compressor protection device
uses a Green and Red LED to indicate the compressor status. A solid Green LED denotes a fault free
condition; a blinking Red LED indicates an identifiable fault condition.
Note:
If the compressor has tripped, the resistance will be 4500 ohms or greater; when reset, they
will be less than 2750 ohms.
Blink Code: The blink code consists of different on / off time of the Red LED which is repeated
continuously until either the fault is cleared or until power is cycled.
Table 50. CPM Blink Codes
Fault
LED on
LED off
LED on
LED off
PTC overheat or PTC reset delay active
short blink
long blink
short blink
long blink
Phase loss
long blink
long blink
long blink
long blink
Incorrect phase sequence
short blink
short blink
short blink
long blink
Содержание IntelliPak SAHL Series
Страница 47: ...RT SVX36G EN 47 Installation Figure 16 Unit rigging Figure 17 Typical unit base and roof curb cross section...
Страница 65: ...RT SVX36G EN 65 Installation Figure 30 Hot Water Piping 90 130 Ton Figure 31 Steam Coil Piping 20 36 Ton...
Страница 86: ...86 RT SVX36G EN Installation Figure 38 Field connection diagram notes for 20 89 ton CV or VAV applications...
Страница 87: ...RT SVX36G EN 87 Installation Figure 39 Typical field wiring diagram for 20 89 ton VAV control option 2307 9177...
Страница 88: ...88 RT SVX36G EN Installation Figure 40 Typical field wiring diagram for 20 89 ton VAV control option...
Страница 173: ...RT SVX36G EN 173 Startup Checklists Figure 88 Dry bulb changeover map...
Страница 175: ...RT SVX36G EN 175 Maintenance Figure 89 Unit internal fuse replacement data for air handling units...