solenoid valve closed. If the minimum water level switch opens during a blowdown cycle, the unit
will de-energize the sump pump in order to protect the compressors and sump heater from
insufficient water levels. Once the water level reaches the minimum level input and this input closes
for 10 seconds, the compressors and sump heater operations will be allowed to restart.
Evaporative Condenser Drain Valve Setup
The drain valve is shipped to “Drain During Unit Power Loss Conditions.” This means that when
the unit disconnect is turned off, the 1S2 toggle switch is turned off, or the unit loses power, the
drain will open. The valve is spring loaded and will travel from fully closed to fully open in
approximately 25 seconds.
This is desirable in cold climates where a risk of freezing exists. In milder climates it may be
desirable to keep the water in the sump when unit power is off to avoid unnecessarily wasting water
whenever the unit disconnect is turned off.
To convert the unit to “Hold During Unit Power Loss Conditions”:
1.
Remove power from the unit.
2. Remove the weather shield cover (
3. Loosen the shaft set screw (
), remove the locking clip, and remove the shaft adapter
4. Lift the drain valve actuator and rotate it to the “hold during power loss” position (
5. Reinstall the shaft adapter and locking clip and reinstall the actuator onto the base. Make sure
the arrow on the shaft adapter is set to 0°.
6. Make sure the valve is in the fully closed position, then tighten the shaft set screw.
7.
Reinstall the weather shield cover.
8. Restore power to the unit.
9. At the Human Interface, press SETUP, NEXT until 'Head Pressure Control Setup Submenu” is
seen. Press ENTER.
10. Change the “Sump Drain Valve Relay Control” from Drain to Hold
Figure 44. Drain valve actuator with weather shield
Weather Shield
Shaft Set Screw
Drain Valve Actuator
Содержание IntelliPak SAHL Series
Страница 47: ...RT SVX36G EN 47 Installation Figure 16 Unit rigging Figure 17 Typical unit base and roof curb cross section...
Страница 65: ...RT SVX36G EN 65 Installation Figure 30 Hot Water Piping 90 130 Ton Figure 31 Steam Coil Piping 20 36 Ton...
Страница 86: ...86 RT SVX36G EN Installation Figure 38 Field connection diagram notes for 20 89 ton CV or VAV applications...
Страница 87: ...RT SVX36G EN 87 Installation Figure 39 Typical field wiring diagram for 20 89 ton VAV control option 2307 9177...
Страница 88: ...88 RT SVX36G EN Installation Figure 40 Typical field wiring diagram for 20 89 ton VAV control option...
Страница 173: ...RT SVX36G EN 173 Startup Checklists Figure 88 Dry bulb changeover map...
Страница 175: ...RT SVX36G EN 175 Maintenance Figure 89 Unit internal fuse replacement data for air handling units...