Unit Start Up
5. Use
Table 35, p. 108
to program the Supply Fan for operation by scrolling through the displays.
6. Once the configuration for the Fan is complete, press the NEXT key until the LCD displays the
“Start test in __Sec.” screen. Press the + key to designate the delay before the test is to start.
This service test will begin after the TEST START key is pressed and the delay designated in this
step has elapsed. Press the ENTER key to confirm this choice.
7.
Press the TEST START key to start the test. Remember that the delay designated in step 6 must
elapse before the fans will begin to operate.
Figure 48. Condenser fan location with human interface designator
20 Tons
25-30 Tons
40 Tons
50 Tons
60-75 Tons
Содержание IntelliPak SAHL Series
Страница 47: ...RT SVX36G EN 47 Installation Figure 16 Unit rigging Figure 17 Typical unit base and roof curb cross section...
Страница 65: ...RT SVX36G EN 65 Installation Figure 30 Hot Water Piping 90 130 Ton Figure 31 Steam Coil Piping 20 36 Ton...
Страница 86: ...86 RT SVX36G EN Installation Figure 38 Field connection diagram notes for 20 89 ton CV or VAV applications...
Страница 87: ...RT SVX36G EN 87 Installation Figure 39 Typical field wiring diagram for 20 89 ton VAV control option 2307 9177...
Страница 88: ...88 RT SVX36G EN Installation Figure 40 Typical field wiring diagram for 20 89 ton VAV control option...
Страница 173: ...RT SVX36G EN 173 Startup Checklists Figure 88 Dry bulb changeover map...
Страница 175: ...RT SVX36G EN 175 Maintenance Figure 89 Unit internal fuse replacement data for air handling units...