38
RT-SVX36G-EN
Installation
Figure 11. Evaporative condenser water connection locations
A
B
8.16
19.84
Drain Connection
1 1/4” PVC, Female
Water Supply Connection
3/4” PVC, Female
D
C
A
B
Tons
(EC)
Drain Connection
Inlet Water Connection
A
B
C
D
24, 29 & 36 Ton
60.03
79.31
12.01
12.94
48 & 59 Ton
82.86
102.14
12.01
12.94
73, 80 & 89 Ton
78.56
102.14
23.71
24.64
Содержание IntelliPak SAHL Series
Страница 47: ...RT SVX36G EN 47 Installation Figure 16 Unit rigging Figure 17 Typical unit base and roof curb cross section...
Страница 65: ...RT SVX36G EN 65 Installation Figure 30 Hot Water Piping 90 130 Ton Figure 31 Steam Coil Piping 20 36 Ton...
Страница 86: ...86 RT SVX36G EN Installation Figure 38 Field connection diagram notes for 20 89 ton CV or VAV applications...
Страница 87: ...RT SVX36G EN 87 Installation Figure 39 Typical field wiring diagram for 20 89 ton VAV control option 2307 9177...
Страница 88: ...88 RT SVX36G EN Installation Figure 40 Typical field wiring diagram for 20 89 ton VAV control option...
Страница 173: ...RT SVX36G EN 173 Startup Checklists Figure 88 Dry bulb changeover map...
Страница 175: ...RT SVX36G EN 175 Maintenance Figure 89 Unit internal fuse replacement data for air handling units...