RT-SVX36G-EN
33
Installation
Figure 8.
Minimum operation and service clearances for single and multiple unit installation
L
L
M
Return Air Opening
Fresh Air Intake
Supply Air Opening
Condenser Section
Optional 2’10-3/4” Exhaust/Return Access Door (180° swing)
Hinged 2’10-3/4” Filter Access Door (180° swing)
Hinged 2’10-3/4” Heater Access Door (180° swing)
Hinged 2’10-3/4” Supply Fan Access Door (180° swing) (90-130 ton)
Hinged 2’4-1/2” Control Panel Door (180° swing) (90-130 ton)
Hinged 2’10-3/4” VFD Access Door (180° swing)
Hinged 2’10-3/4” Evap Condenser Access Door (180° swing)
Hinged 2’8” Control Panel Door (180° swing) (20-36 ton)
Hinged 3’6” Control Panel Door (180° swing) (40-89 ton)
A
B
C
D
E
F
G
H
J
K
L
M
=
=
=
=
=
=
=
=
=
=
=
=
Single Unit Installation
Legend
Содержание IntelliPak SAHL Series
Страница 47: ...RT SVX36G EN 47 Installation Figure 16 Unit rigging Figure 17 Typical unit base and roof curb cross section...
Страница 65: ...RT SVX36G EN 65 Installation Figure 30 Hot Water Piping 90 130 Ton Figure 31 Steam Coil Piping 20 36 Ton...
Страница 86: ...86 RT SVX36G EN Installation Figure 38 Field connection diagram notes for 20 89 ton CV or VAV applications...
Страница 87: ...RT SVX36G EN 87 Installation Figure 39 Typical field wiring diagram for 20 89 ton VAV control option 2307 9177...
Страница 88: ...88 RT SVX36G EN Installation Figure 40 Typical field wiring diagram for 20 89 ton VAV control option...
Страница 173: ...RT SVX36G EN 173 Startup Checklists Figure 88 Dry bulb changeover map...
Страница 175: ...RT SVX36G EN 175 Maintenance Figure 89 Unit internal fuse replacement data for air handling units...