RT-SVX36G-EN
61
Installation
Flue Assembly Installation
1.
Locate the flue assembly and the extension (refer to
for extension usage) in the ship
with section of the unit.
2. Install the flue extension onto the flue assembly as shown in
3. Slide the pipe clamp onto the heater flue tube located inside the heater compartment.
4. Insert the tube on the flue assembly into the hole located in the vertical support for the heat
section.
5. Butt both flue tube sections together and center the pipe clamp over joint.
6. Using the pre-punch holes in the flue assembly, extension, and the vertical support, install the
appropriate number of mounting brackets. Refer to
for details.
Figure 27. Modulating 500 - 1000 MBH
Burner Nozzle
Burner Nozzle
Pilot Shutoff Valve
Pilot Shutoff Valve
Pilot Solenoid Valve
Pilot Solenoid Valve
Pilot Regulator Valve
Pilot Regulator Valve
Pilot Shutoff Valve
Pilot Shutoff Valve
Modulating Gas Valve
Modulating Gas Valve
Shutoff Valve
Shutoff Valve
Содержание IntelliPak SAHL Series
Страница 47: ...RT SVX36G EN 47 Installation Figure 16 Unit rigging Figure 17 Typical unit base and roof curb cross section...
Страница 65: ...RT SVX36G EN 65 Installation Figure 30 Hot Water Piping 90 130 Ton Figure 31 Steam Coil Piping 20 36 Ton...
Страница 86: ...86 RT SVX36G EN Installation Figure 38 Field connection diagram notes for 20 89 ton CV or VAV applications...
Страница 87: ...RT SVX36G EN 87 Installation Figure 39 Typical field wiring diagram for 20 89 ton VAV control option 2307 9177...
Страница 88: ...88 RT SVX36G EN Installation Figure 40 Typical field wiring diagram for 20 89 ton VAV control option...
Страница 173: ...RT SVX36G EN 173 Startup Checklists Figure 88 Dry bulb changeover map...
Страница 175: ...RT SVX36G EN 175 Maintenance Figure 89 Unit internal fuse replacement data for air handling units...