RT-SVX36G-EN
139
Unit Start Up
Evaporative Condenser Startup
Important:
Water treatment by a qualified water treatment expert is required to ensure proper
equipment life and product performance. Dolphin Water Care is an option offered by
Trane that is NOT a substitute for regular water treatment by a qualified water
treatment professional. If a water treatment system is not operating on the unit, do
not proceed.
Startup for evaporative and air-cooled condensers is initially the same. In addition, the following
is required for evaporative condensers prior to startup:
•
All water and drain connections must be checked and verified
•
Evaporative condensers will ship with a fan support bracket to reduce damage caused by
vibration during shipment. The shipping support brackets must be removed prior to unit
startup. See
“To remove shipping brackets,” p. 140
and
Figure 60, p. 141
for removal
instructions.
•
Verify that inlet water pressure is 35-60 PSIG, dynamic pressure (measured with the valve open)
•
Verify that drain valve is set to “drain during power loss” or “hold during power loss” per job
specification
•
Upon a call for cooling, the sump will fill with water. Verify that the sump fills to a level within
the slot on the max float bracket as shown in
Figure 59. Compressor locations
20-36 Ton
40-89 Ton
Compressor A
HI Designator “K10”
Compressor B
HI Designator “K11”
Compressor 2B
HI Designator “K4”
Compressor 2A
HI Designator “K3”
Compressor 1A
HI Designator “K11”
Compressor 1B
HI Designator “K12”
Compressor 1B
HI Designator “K12”
Compressor 2B
HI Designator “K4”
Compressor 2A
HI Designator “K3”
Compressor 1A
HI Designator “K11”
90-130 Ton
Содержание IntelliPak SAHL Series
Страница 47: ...RT SVX36G EN 47 Installation Figure 16 Unit rigging Figure 17 Typical unit base and roof curb cross section...
Страница 65: ...RT SVX36G EN 65 Installation Figure 30 Hot Water Piping 90 130 Ton Figure 31 Steam Coil Piping 20 36 Ton...
Страница 86: ...86 RT SVX36G EN Installation Figure 38 Field connection diagram notes for 20 89 ton CV or VAV applications...
Страница 87: ...RT SVX36G EN 87 Installation Figure 39 Typical field wiring diagram for 20 89 ton VAV control option 2307 9177...
Страница 88: ...88 RT SVX36G EN Installation Figure 40 Typical field wiring diagram for 20 89 ton VAV control option...
Страница 173: ...RT SVX36G EN 173 Startup Checklists Figure 88 Dry bulb changeover map...
Страница 175: ...RT SVX36G EN 175 Maintenance Figure 89 Unit internal fuse replacement data for air handling units...