RT-SVX36G-EN
71
Installation
Table 21. Compressor electrical service sizing data (20 - 130 ton)
(a)
(a) Evaporative Condenser Units only available in 460V
200V
230V
460V
575V
Tonnage (AC/EC)
No. of
Compressors
RLA
LRA
RLA
LRA
RLA
LRA
RLA
LRA
20 (Std)
2
41.4
267
35.5
267
18.6
142
15.8
103
20/24 (Hi)
2
41.4
267
35.5
267
18.6
142
15.8
103
25 (Std)
1
41.4
267
35.5
267
18.6
142
15.8
103
1
47
304
42.3
304
20.2
147
17.1
122
25/29 (Hi)
1
41.4
267
35.5
267
18.6
142
15.8
103
1
51.9
315
47
315
22.2
158
19.2
136
30 (Std)
2
51.9
315
47
315
22.2
158
19.2
136
30/36 (Hi)
1
51.9
315
47
315
22.2
158
19.2
136
1
56.9
351
48.8
351
25.5
197
23.1
135
40 (Std)
2
31.3
203
30.4
203
13.1
98
11.9
84
2
37.3
267
31.8
267
15.9
142
14.5
103
40/48 (Hi)
4
37.3
267
31.8
267
15.9
142
14.5
103
50 (Std)
4
41.4
267
35.5
267
18.6
142
15.8
103
50(Hi)
2
41.4
267
35.5
267
18.6
142
15.8
103
2
47
304
42.3
304
20.2
147
17.1
122
55 (Std)/59 (Hi)
4
47
304
42.3
304
20.2
147
17.1
122
60 (Std)
2
47
304
42.3
304
20.2
147
17.1
122
2
51.9
315
47
315
22.2
158
19.2
136
60/73 (Hi)
4
51.9
315
47
315
22.2
158
19.2
136
70/80(Std)
4
56.9
351
48.8
351
25.5
197
23.1
146
75 (Std)
2
60.5
320
52
320
25.4
160
20.3
135
2
83.9
485
74.5
485
37.2
215
29.8
175
75/89 (Hi)
2
60.5
320
52
320
25.4
160
20.3
135
2
83.9
485
74.5
485
37.2
215
29.8
175
90 (Std & High)
4
N/A
N/A
N/A
N/A
36
215
29
175
105 (Hi)
2
N/A
N/A
N/A
N/A
36
215
29
175
2
N/A
N/A
N/A
N/A
45
260
36
210
115 (Std)
2
N/A
N/A
N/A
N/A
36
215
29
175
2
N/A
N/A
N/A
N/A
45
260
36
210
130 (Std)
4
N/A
N/A
N/A
N/A
45
260
36
210
Содержание IntelliPak SAHL Series
Страница 47: ...RT SVX36G EN 47 Installation Figure 16 Unit rigging Figure 17 Typical unit base and roof curb cross section...
Страница 65: ...RT SVX36G EN 65 Installation Figure 30 Hot Water Piping 90 130 Ton Figure 31 Steam Coil Piping 20 36 Ton...
Страница 86: ...86 RT SVX36G EN Installation Figure 38 Field connection diagram notes for 20 89 ton CV or VAV applications...
Страница 87: ...RT SVX36G EN 87 Installation Figure 39 Typical field wiring diagram for 20 89 ton VAV control option 2307 9177...
Страница 88: ...88 RT SVX36G EN Installation Figure 40 Typical field wiring diagram for 20 89 ton VAV control option...
Страница 173: ...RT SVX36G EN 173 Startup Checklists Figure 88 Dry bulb changeover map...
Страница 175: ...RT SVX36G EN 175 Maintenance Figure 89 Unit internal fuse replacement data for air handling units...