110
RT-SVX36G-EN
Unit Start Up
Not
es:
1.
C
omp
res
so
rs fo
r t
h
e 2
0
t
h
ru
60
T
o
n u
n
it
s can o
p
er
ate
i
n
di
vi
dual
ly
or t
o
get
h
er
and
in
an
y o
rde
r wh
ile i
n
t
h
e SERVI
C
E
TEST
mo
de
.
2.
C
omp
res
so
rs 1
A
&1
B an
d co
mp
ress
or
s 2
A
& 2
B
o
pe
rate
si
mul
tan
eo
us
ly w
it
h
in
t
h
ei
r res
pec
ti
ve
c
irc
ui
ts
on
th
e 7
0
th
ru 7
5
T
o
n un
it
s.
3.
C
on
d
en
se
r fan o
u
tp
u
ts
can o
p
er
ate
i
n
di
vi
dual
ly
or t
o
get
h
er
and
in
an
y o
rde
r wh
ile i
n
t
h
e SERVI
C
E T
E
ST
mo
de.
4.
On
ce t
h
e un
it
has
st
arte
d,
refe
r to
t
h
e St
at
us
Me
nu
i
n
t
h
e Hu
man
Inter
face for the
OA CFM.
5.
R
T
M OCC
/UNOCC
output in the
S
ervice T
est Mode
mu
st be
i
n
t
h
e u
n
occu
pied m
od
e to
ope
n
the
system V
A
V
bo
xe
s or to
d
riv
e the VF
D t
o 1
0
0%
.
Impor
tant:
Do not opera
te the compre
ssor
s
for extended periods of time wi
thou
t th
e c
ond
enser fans;
hig
h
h
e
ad
pressure wi
ll
devel
o
p
.
LI
M
IT
E
D
MO
D
U
LAT
ING
ON
ON
OFF
A
LL OFF
9
0
%
Select
OFF
O
FF
OFF
OFF
(High
Fi
re
Adj
u
stment)
LI
M
IT
E
D
MO
D
U
LAT
ING
ON
ON
OFF
A
LL OFF
3
3
%
Select
OFF
O
FF
OFF
OFF
(Low F
ire
Adj
u
stment)
ELECTR
IC
H
E
AT
ON
ON
OFF
A
LL OFF
O
N
ON
ON
OFF
O
FF
OFF
OFF
Stag
e 1
O
N
O
N
O
FF
ALL OFF
O
N
O
FF
OFF
O
FF
O
FF
O
FF
OFF
Stag
e 2
ON
ON
OFF
ALL OFF
OFF
ON
OFF
OFF
O
FF
OFF
OFF
Stag
e 3
O
N
O
N
O
FF
ALL OFF
O
FF
OFF
O
N
O
FF
O
FF
O
FF
OFF
HY
D
R
O
N
IC HE
A
T
OF
F
OFF
OFF
A
LL OFF
1
00% Sele
ct
OFF
O
FF
OFF
OFF
PRE-H
EAT
ER
OF
F
OFF
OFF
A
LL OFF
O
N
N
/A
N
/A
OFF
O
FF
OFF
OFF
FR
ESH
A
IR
DA
M
P
E
R
S
OF
F
OFF
OFF
A
LL OFF
1
00% Sele
ct
OFF
O
FF
OFF
OFF
EXH
A
UST
DA
M
P
E
R
S
OF
F
OFF
OFF
A
LL OFF
1
00% Sele
ct
OFF
O
FF
OFF
OFF
RE
H
E
A
T
Cooling V
alv
e
OF
F
OFF
OFF
OFF
OFF
OFF
OFF
OFF
O
FF
OFF
OFF
R
ehe
at
V
al
ve
OF
F
OFF
OFF
OFF
OFF
OFF
OFF
OFF
O
FF
OFF
OFF
Pu
mpout Sol
enoi
d
OF
F
OFF
OFF
OFF
OFF
OFF
OFF
OFF
O
FF
OFF
OFF
EV
AP C
O
N
D
Su
mp Pu
mp
OF
F
OFF
OFF
OFF
OFF
OFF
OFF
OFF
O
FF
OFF
OFF
Sump Heater
OF
F
OFF
OFF
OFF
OFF
OFF
OFF
OFF
O
FF
OFF
OFF
T
a
b
le 35.
Service t
e
st gu
id
e
fo
r c
o
m
p
o
n
ent o
p
er
atio
n
— P
a
rt
I
o
f II
(
c
on
ti
nu
ed
)
C
o
mpone
n
t
Be
ing
Te
ste
d
C
O
MP
O
N
E
N
T
CO
N
F
IG
UR
A
TI
O
N
S
u
pply
Fa
n
Return
Fa
n
E
xhaust
Fan
Condenser
Fa
ns
H
e
at S
tages
Compressor Sta
g
e
1
2
3
12
34
Содержание IntelliPak SAHL Series
Страница 47: ...RT SVX36G EN 47 Installation Figure 16 Unit rigging Figure 17 Typical unit base and roof curb cross section...
Страница 65: ...RT SVX36G EN 65 Installation Figure 30 Hot Water Piping 90 130 Ton Figure 31 Steam Coil Piping 20 36 Ton...
Страница 86: ...86 RT SVX36G EN Installation Figure 38 Field connection diagram notes for 20 89 ton CV or VAV applications...
Страница 87: ...RT SVX36G EN 87 Installation Figure 39 Typical field wiring diagram for 20 89 ton VAV control option 2307 9177...
Страница 88: ...88 RT SVX36G EN Installation Figure 40 Typical field wiring diagram for 20 89 ton VAV control option...
Страница 173: ...RT SVX36G EN 173 Startup Checklists Figure 88 Dry bulb changeover map...
Страница 175: ...RT SVX36G EN 175 Maintenance Figure 89 Unit internal fuse replacement data for air handling units...