Unit Start Up
Pressure Curves
To Check Operating Pressures
1.
Start the unit and allow the pressures to stabilize.
Note:
If unit includes the Modulating Dehumidification Control option, pressure curves apply to
the cooling mode only.
2. Measure the outdoor air dry bulb temperature (F) entering the condenser coil.
3. Measure the discharge and suction pressure (psig) next to the compressor.
4. Plot the outdoor dry bulb temperature and the operating suction pressure (psig) onto the chart.
5. At the point of intersection, read to the left for the discharge pressure. The measured discharge
pressure should be within ± 7 psig of the graph.
Note:
To check operating pressure, see instructions
Figure 62. 20 ton standard operating pressure curve (all compressors and condenser fans “On”)
COOLING CYCLE PRESSURE CURVE
95 °F Ambient
85 °F Ambient
75 °F Ambient
65 °F Ambient
105 °F Ambient
250
300
350
400
450
500
550
90
100
110
120
130
140
150
160
170
180
Suction Pressure, PSIG
D
ischar
ge P
ressur
e
, P
S
IG
Содержание IntelliPak SAHL Series
Страница 47: ...RT SVX36G EN 47 Installation Figure 16 Unit rigging Figure 17 Typical unit base and roof curb cross section...
Страница 65: ...RT SVX36G EN 65 Installation Figure 30 Hot Water Piping 90 130 Ton Figure 31 Steam Coil Piping 20 36 Ton...
Страница 86: ...86 RT SVX36G EN Installation Figure 38 Field connection diagram notes for 20 89 ton CV or VAV applications...
Страница 87: ...RT SVX36G EN 87 Installation Figure 39 Typical field wiring diagram for 20 89 ton VAV control option 2307 9177...
Страница 88: ...88 RT SVX36G EN Installation Figure 40 Typical field wiring diagram for 20 89 ton VAV control option...
Страница 173: ...RT SVX36G EN 173 Startup Checklists Figure 88 Dry bulb changeover map...