58
RT-SVX36G-EN
Installation
Note:
Do not rely on the gas train shutoff valves to isolate the unit while conducting gas pressure/
leak test. These valves are not designed to withstand pressures in excess of 14" w.c. or 0.5
psig.
Connecting the Gas Supply Line to the Furnace Gas Train
Follow the steps below to complete the installation between the supply gas line and the furnace.
Refer to
through
for the appropriate gas train configuration.
1.
Connect the supply gas piping using a “ground-joint” type union to the furnace gas train and
check for leaks.
2. Adjust the inlet supply pressure to the recommended 7" to 14" w.c. parameter for natural gas.
3. Ensure that the piping is adequately supported to avoid gas train stress.
Table 16. Sizing Natural Gas Pipe Mains and Branches
Gas Input (Cubic Feet/Hour)*
Gas Supply
Pipe Run (ft)
1-1/4"
Pipe
1-1/2"
Pipe
2"
Pipe
2-1/2"
Pipe
3"
Pipe
4"
Pipe
10
1050
1600
3050
4800
8500
17500
20
730
1100
2100
3300
5900
12000
30
590
890
1650
2700
4700
9700
40
500
760
1450
2300
4100
8300
50
440
670
1270
2000
3600
7400
60
400
610
1150
1850
3250
6800
70
370
560
1050
1700
3000
6200
80
350
530
990
1600
2800
5800
90
320
490
930
1500
2600
5400
100
305
460
870
1400
2500
5100
125
275
410
780
1250
2200
4500
150
250
380
710
1130
2000
4100
175
225
350
650
1050
1850
3800
200
210
320
610
980
1700
3500
* Table is based on a specific gravity of 0.60. Use
for the specific gravity of the local gas supply.
Table 17. Specific Gravity Multipliers
Specific Gravity
Multiplier
0.50
1.10
0.55
1.04
0.60
1.00
0.65
0.96
Содержание IntelliPak SAHL Series
Страница 47: ...RT SVX36G EN 47 Installation Figure 16 Unit rigging Figure 17 Typical unit base and roof curb cross section...
Страница 65: ...RT SVX36G EN 65 Installation Figure 30 Hot Water Piping 90 130 Ton Figure 31 Steam Coil Piping 20 36 Ton...
Страница 86: ...86 RT SVX36G EN Installation Figure 38 Field connection diagram notes for 20 89 ton CV or VAV applications...
Страница 87: ...RT SVX36G EN 87 Installation Figure 39 Typical field wiring diagram for 20 89 ton VAV control option 2307 9177...
Страница 88: ...88 RT SVX36G EN Installation Figure 40 Typical field wiring diagram for 20 89 ton VAV control option...
Страница 173: ...RT SVX36G EN 173 Startup Checklists Figure 88 Dry bulb changeover map...
Страница 175: ...RT SVX36G EN 175 Maintenance Figure 89 Unit internal fuse replacement data for air handling units...