3 STORAGE AND TRANSPORT
LCM 1010 Instruction Manual
3.3
Transport of Machine
Unpacking, lifting, and transport o f the m achine are to be perform ed solely by service
engineers o f TOWA Corporation.
Confirm the location where the m achine is to b e installed in advance.
A CAUTION
Wear the designated protective gear and work clothing and take
sufficient caution when transporting the machine.
Make sure to prepare a space wide enough to work effectively.
3.3.1
Unpacking
The m achine is delivered in a wooden crate. Observe the following procedures for
unpacking and dismantling the crate.
A
CAUTION
Prepare an appropriate working platform and stepladderto proceed
with the unpacking. There is a risk of falling and suffering injury.
(1)
Remove the top, front, sides and rear, respectively, in order.
3-4
TSW A
Содержание LCM1010
Страница 9: ...1 GENERAL INFORMATION LCM 1010 Instruction Manual TCWA...
Страница 86: ...LCM1010 Instruction Manual 5 PREPARATION TCWA 5 5...
Страница 111: ...6 OPERATION LCM 1010 Instruction Manual 6 22 TCWA...
Страница 174: ...LCM1010 Instruction Manual 2 SAFETY NOTE The f gure below is for use with four Press Modules Automatic T WA 2 39...
Страница 191: ...3 OUTLINE OF MACHINE LCM 1010 Instruction Manual 3 12 TSWA...
Страница 193: ...4 OPERATION SWITCHES AND BUTTONS LCM 1010 Instruction Manual T WA...
Страница 211: ...LCM1010 Instruction Manual 5 PREPARATION TSWA 5 5...
Страница 433: ...LCM 1010 Instruction Manual 4 INSTALLATION NOTE The figure below is for use with four Press modules Automatic TCWA 4 5...
Страница 480: ...4 INSTALLATION LCM1010 Instruction Manual Factory facility 1 n il 555l I 4 52 TCWA...
Страница 493: ...hoocividli Mi u r c rtoociviDLi piN mcuftoc u r m MMorum luivi iu iu instruction manual t w a...
Страница 528: ...APPEND APPENDIX 1 4 CHARGE NUMBERLIST TSWA APPENDI...
Страница 533: ...APPENt g APPENDIX 2 3 RedpeDataandConstantData TSWA APPENDI...
Страница 549: ...4...
Страница 551: ...P R E S S M O D U L E I...