AUTOMATIC TRANSMISSION (4 A / T)
7B1-73
1. Drain plug
2. Level and filler plug
In Engine Room
1) Remove battery and dipstick.
2) Disconnect CKP sensor connector.
3) Remove CKP sensor mounting bolt and then remove CKP sen-
sor from torque converter housing.
4) Remove starter motor. But don’t disconnect its wiring harness.
5) Remove transmission to engine bolt.
On Lift
1) Remove transfer skid plate (if equipped).
2) Drain transfer oil.
“A”: Sealant 99000-31110
Tightening torque
Transfer oil drain and level / filler plugs (a):
23 N
.
m(2.3 kg-m, 17.0 lb-ft)
3) Before removing propeller shaft, give match marks (1) on joint
flange and propeller shaft as shown in the figure.
4) Remove universal joint flange bolts and take out rear propeller
shaft.
5) Likewise, take out front propeller shaft.
6) Remove nut from the end of select cable and bracket to set
cable free.
7) Remove select cable bracket by removing its 2 bolts.
8) Remove exhaust No.1 and No.2 pipe.
9) Remove stabilizer bar mount bush bracket bolts.
10) Unclamp and disconnect oil cooler hoses from pipes.
NOTE:
To avoid leakage of transmission fluid, plug open ends of
oil cooler pipes and hoses right after they are discon-
nected.
11) Remove torque converter housing lower plate.
12) Holding crankshaft pulley bolt stationary with wrench, remove
torque converter mounting bolts (1) with wrench.
13) Apply transmission jack (1) and take off rear mounting member
by removing its bolts.
Содержание GRAND VITARA XL-7
Страница 285: ...ENGINE AND EMISSION CONTROL SYSTEM RHZ ENGINE 6E3 7 SYSTEM WIRING DIAGRAM For Vehicle Equipped with Single Connector ECM...
Страница 287: ...ENGINE AND EMISSION CONTROL SYSTEM RHZ ENGINE 6E3 9 For Vehicle Equipped with Triple Connector ECM...
Страница 521: ...7B1 116 AUTOMATIC TRANSMISSION 4 A T BEARING AND RACE INSTALLATION DIAGRAM...
Страница 597: ...Prepared by 1st Ed Feb 2002 Printed in Japan Printing 600...