DIFFERENTIAL (FRONT)
7E-13
1. Mounting bracket R
2. Mounting bracket L
7) Position each bush to bracket as shown.
Length “a”: 3.0 mm (0.12 in.)
8) Use following torque for reinstallation.
Tightening Torque
Front mounting bolt (a):
85 N
.
m (8.5 kg-m, 61.5 lb-ft)
Front mounting bracket bolt (b):
50 N
.
m (5.0 kg-m, 36.5 lb-ft)
REAR MOUNTING
(For front differential carrier)
1) Lift up vehicle and remove rear mounting bracket (3) by remov-
ing rear mounting bolt (1) and rear mounting bracket bolts (2).
2) Check mounting rubber for damage or deterioration and replace
as necessary.
3) Tighten rear mounting bolts (1) and rear mounting bracket bolts
(2) to specified torque for reinstallation.
Tightening torque
Rear mounting bolt (a):
85 N
.
m (8.5 kg-m, 61.5 lb-ft)
Rear mounting bracket bolts (b):
60 N
.
m (6.0 kg-m, 43.5 lb-ft)
Содержание GRAND VITARA XL-7
Страница 285: ...ENGINE AND EMISSION CONTROL SYSTEM RHZ ENGINE 6E3 7 SYSTEM WIRING DIAGRAM For Vehicle Equipped with Single Connector ECM...
Страница 287: ...ENGINE AND EMISSION CONTROL SYSTEM RHZ ENGINE 6E3 9 For Vehicle Equipped with Triple Connector ECM...
Страница 521: ...7B1 116 AUTOMATIC TRANSMISSION 4 A T BEARING AND RACE INSTALLATION DIAGRAM...
Страница 597: ...Prepared by 1st Ed Feb 2002 Printed in Japan Printing 600...