ENGINE AND EMISSION CONTROL SYSTEM (RHZ ENGINE)
6E3-29
6) Tighten union nuts of high pressure supply pipe and high pres-
sure pipes to specified torque.
When tightening each union nut, hold union nuts of injector and
injection pump with wrench as shown.
Special Tool
(A): 09950-76510 / OUT0000148
Tightening Torque
High pressure supply pipe union nut
(a): 20 N
.
m (2.0 kg-m, 14.5 lb-ft)
High pressure pipe union nut
(b): 20 N
.
m (2.0 kg-m, 14.5 lb-ft)
7) Install PCV hose (2) and bracket (1).
8) Install fuel temperature sensor referring to “FUEL TEMPERA-
TURE SENSOR” in this section.
9) Install intercooler referring to “INTERCOOLER” in this section.
10) Connect negative cable at battery.
11) Check fuel leakage by performing step 12) described in “FUEL
INJECTOR INSTALLATION” in this section.
Содержание GRAND VITARA XL-7
Страница 285: ...ENGINE AND EMISSION CONTROL SYSTEM RHZ ENGINE 6E3 7 SYSTEM WIRING DIAGRAM For Vehicle Equipped with Single Connector ECM...
Страница 287: ...ENGINE AND EMISSION CONTROL SYSTEM RHZ ENGINE 6E3 9 For Vehicle Equipped with Triple Connector ECM...
Страница 521: ...7B1 116 AUTOMATIC TRANSMISSION 4 A T BEARING AND RACE INSTALLATION DIAGRAM...
Страница 597: ...Prepared by 1st Ed Feb 2002 Printed in Japan Printing 600...