ENGINE AND EMISSION CONTROL SYSTEM (RHZ ENGINE)
6E3-17
6) Remove turbocharger outlet pipe bolts and nuts.
7) Remove turbocharger bracket bolt (1).
8) Disconnect oil return pipe (2) and lubrication pipe (3) from
turbocharger.
9) Remove EGR pipe referring to “EGR VALVE” in this section.
10) Remove exhaust manifold nuts (1).
11) Remove 6 stud bolts (2) using stud bolt remover.
12) Remove turbocharger with exhaust manifold and manifold
gasket (3).
13) Remove turbocharger from exhaust manifold.
INSPECTION
Rotate turbine shaft (1) by hand and verify that it turns smoothly
without any abnormal noise and excessive runout.
If not as specified, replace the turbocharger.
INSTALLATION
For installation, reverse removal procedure noting the follow-
ing.
D
Clean mating surfaces of turbocharger, turbocharger outlet pipe,
exhaust manifold and cylinder head.
D
Use new gaskets.
D
Tighten each nuts and bolts to specified torque referring to
“TURBOCHARGER” in this section.
Содержание GRAND VITARA XL-7
Страница 285: ...ENGINE AND EMISSION CONTROL SYSTEM RHZ ENGINE 6E3 7 SYSTEM WIRING DIAGRAM For Vehicle Equipped with Single Connector ECM...
Страница 287: ...ENGINE AND EMISSION CONTROL SYSTEM RHZ ENGINE 6E3 9 For Vehicle Equipped with Triple Connector ECM...
Страница 521: ...7B1 116 AUTOMATIC TRANSMISSION 4 A T BEARING AND RACE INSTALLATION DIAGRAM...
Страница 597: ...Prepared by 1st Ed Feb 2002 Printed in Japan Printing 600...