6B-12
ENGINE COOLING
INSPECTION
Check radiator for leakage or damage. Straighten bent fins, if any.
CLEANING
Clean frontal area of radiator cores.
INSTALLATION
Reverse removal procedures, noting the followings.
D
Refill cooling system with proper coolant referring to “COOLANT”
and steps 8) to 10) of “COOLING SYSTEM FLUSH AND REFILL”
in this section.
D
After installation, check each joint for leakage.
D
With A / T vehicle, check A / T fluid level, referring to Section 7B1.
RADIATOR FAN RELAY
INSPECTION
Refer to “RADIATOR FAN CONTROL SYSTEM” in Section 6E3.
Содержание GRAND VITARA XL-7
Страница 285: ...ENGINE AND EMISSION CONTROL SYSTEM RHZ ENGINE 6E3 7 SYSTEM WIRING DIAGRAM For Vehicle Equipped with Single Connector ECM...
Страница 287: ...ENGINE AND EMISSION CONTROL SYSTEM RHZ ENGINE 6E3 9 For Vehicle Equipped with Triple Connector ECM...
Страница 521: ...7B1 116 AUTOMATIC TRANSMISSION 4 A T BEARING AND RACE INSTALLATION DIAGRAM...
Страница 597: ...Prepared by 1st Ed Feb 2002 Printed in Japan Printing 600...