ENGINE MECHANICAL (RHZ ENGINE)
6A3-25
8) Install front differential housing according to installation proce-
dure described in Section 7E.
9) Refill front differential housing with gear oil, referring to Section
7E.
10) Install steering gear box to vehicle referring to Section 3B1.
11) Install oil level gauge.
12) Refill engine with engine oil, referring to item “ENGINE OIL
CHANGE” in Section 0B.
13) Refill power steering system with specified fluid referring to
Section 3B1.
14) Check to make sure that there is no engine oil leakage, differ-
ential oil leakage and power steering fluid leakage at each con-
nection.
Содержание GRAND VITARA XL-7
Страница 285: ...ENGINE AND EMISSION CONTROL SYSTEM RHZ ENGINE 6E3 7 SYSTEM WIRING DIAGRAM For Vehicle Equipped with Single Connector ECM...
Страница 287: ...ENGINE AND EMISSION CONTROL SYSTEM RHZ ENGINE 6E3 9 For Vehicle Equipped with Triple Connector ECM...
Страница 521: ...7B1 116 AUTOMATIC TRANSMISSION 4 A T BEARING AND RACE INSTALLATION DIAGRAM...
Страница 597: ...Prepared by 1st Ed Feb 2002 Printed in Japan Printing 600...