AUTOMATIC TRANSMISSION (4 A / T)
7B1-113
1. Bolt A
2. Bolt B
3. Bolt C
4. Bolt D
Accumulator piston and spring specification:
Used for
Piston outer
diameter “a”
Spring free length “b”
Identification
painting
Direct clutch accumulator (2)
31.80 – 31.85 mm
Upper spring
58.96 mm (2.321 in.)
Light blue
Direct clutch accumulator (2)
(1.252 – 1.254 in.)
Lower spring
–
–
Forward clutch accumulator (1)
31.80 – 31.85 mm
Upper spring
75.03 mm (2.954 in.)
White + blue
Forward clutch accumulator (1)
(1.252 – 1.254 in.)
Lower spring
–
–
Second brake accumulator (3)
34.80 – 34.85 mm
Upper spring
56.4 mm (2.220 in.)
Green
Second brake accumulator (3)
(1.370 – 1.372 in.)
Lower spring
18.5 mm (0.728 in.)
Light blue
33) After confirming that accumulator piston is pushed all the way
down, match pin (1) of manual shift lever with groove in manual
valve (2).
34) Install valve body assembly by using bolts noting its length
shown below.
Tightening torque
Valve body bolts (a): 10 N
.
m (1.0 kg-m, 7.5 lb-ft)
Valve body bole length
Bolt
Length
Pieces
A
45 mm (1.77 in.)
7
B
36 mm (1.42 in.)
4
C
30 mm (1.22 in.)
2
D
28 mm (1.10 in.)
4
35) Using plastic hammer, install oil pipe (1).
Содержание GRAND VITARA XL-7
Страница 285: ...ENGINE AND EMISSION CONTROL SYSTEM RHZ ENGINE 6E3 7 SYSTEM WIRING DIAGRAM For Vehicle Equipped with Single Connector ECM...
Страница 287: ...ENGINE AND EMISSION CONTROL SYSTEM RHZ ENGINE 6E3 9 For Vehicle Equipped with Triple Connector ECM...
Страница 521: ...7B1 116 AUTOMATIC TRANSMISSION 4 A T BEARING AND RACE INSTALLATION DIAGRAM...
Страница 597: ...Prepared by 1st Ed Feb 2002 Printed in Japan Printing 600...