ENGINE AND EMISSION CONTROL SYSTEM (RHZ ENGINE)
6E3-23
FUEL PUMP
ON-VEHICLE INSPECTION
1) Check that fuel pump operating sound is heard from fuel pump
for 5 seconds and then stop when turning on ignition switch.
If above check result is not satisfactory, advance to “Diagnostic
Flow Table B-1” in Section 6.
2) Check that fuel pressure is felt at fuel feed hose (1) for about 5
seconds after ignition switch ON.
If fuel pressure is not felt, advance to “Diagnostic Flow Table
B-3” in following section.
D
For vehicle equipped with single-connector ECM : Section 6
D
For vehicle equipped with triple-connector ECM : Section 6-1
REMOVAL / INSPECTION/ INSTALLATION
Refer to “FUEL PUMP” in Section 6C.
FUEL HEATER
Refer to “FUEL HEATER” in Section 6C.
Содержание GRAND VITARA XL-7
Страница 285: ...ENGINE AND EMISSION CONTROL SYSTEM RHZ ENGINE 6E3 7 SYSTEM WIRING DIAGRAM For Vehicle Equipped with Single Connector ECM...
Страница 287: ...ENGINE AND EMISSION CONTROL SYSTEM RHZ ENGINE 6E3 9 For Vehicle Equipped with Triple Connector ECM...
Страница 521: ...7B1 116 AUTOMATIC TRANSMISSION 4 A T BEARING AND RACE INSTALLATION DIAGRAM...
Страница 597: ...Prepared by 1st Ed Feb 2002 Printed in Japan Printing 600...