6A3-10
ENGINE MECHANICAL (RHZ ENGINE)
(B)
4. Camshaft timing belt pulley
INSPECTION
D
Inspect timing belt for wear or crack.
Replace it as necessary.
D
Inspect timing belt tensioner and roller for smooth rotation.
INSTALLATION
1) Install timing belt tensioner (1) and roller (2).
Do not tighten timing belt tensioner bolt with wrench yet. Tighten
by hand only at this time.
Tightening Torque
Roller bolt (a): 45 N
.
m (4.5 kg-m, 32.5 lb-ft)
2) Check that camshaft hub (5) is locked inserting special tool (A)
into cylinder head hole (6) as shown in figure.
Special Tool
(A): 09910-26540 / OUT0000151
3) Check that flywheel (MT) or drive plate (AT) is locked inserting
special tool (B) into holes in both cylinder block and flywheel
(MT) (or drive plate (AT)) with crank timing pulley key (7) turned
up.
Special Tool
(B): 09910-26530 / OUT0000160
4) Loosen camshaft timing belt pulley bolts (3).
NOTE:
Do not remove camshaft timing belt pulley bolts (3).
Содержание GRAND VITARA XL-7
Страница 285: ...ENGINE AND EMISSION CONTROL SYSTEM RHZ ENGINE 6E3 7 SYSTEM WIRING DIAGRAM For Vehicle Equipped with Single Connector ECM...
Страница 287: ...ENGINE AND EMISSION CONTROL SYSTEM RHZ ENGINE 6E3 9 For Vehicle Equipped with Triple Connector ECM...
Страница 521: ...7B1 116 AUTOMATIC TRANSMISSION 4 A T BEARING AND RACE INSTALLATION DIAGRAM...
Страница 597: ...Prepared by 1st Ed Feb 2002 Printed in Japan Printing 600...