ENGINE MECHANICAL (RHZ ENGINE)
6A3-39
1. Piston
2. Cylinder block
“a”: 10 mm (0.40 in.)
1. Notch
INSTALLATION
1) Clean mating surface of cylinder head and cylinder block.
Remove oil, old gasket and dust from mating surface.
2) Prepare optimum cylinder head gasket according to following
procedure.
a) As shown in figure, piston projects above cylinder block when
it reaches top dead center. Using special tool and dial gauge,
measure projection “b” at two points “A” and “B” and take an
average. Repeat this procedure with each piston.
Special Tool
(A): 09910-26510/OUT 0000005
b) Using the largest value among averages obtained above,
prepare optimum cylinder head gasket referring to table be-
low.
Notch
Thickness of Gasket (mm (in.))
Measured Value (mm (in.))
1
1.24 – 1.36 (0.049 – 0.054)
0.470 – 0.604 (0.019 – 0.024)
2
1.29 – 1.41 (0.051 – 0.056)
0.605 – 0.654 (0.024 – 0.026)
3
1.34 – 1.46 (0.053 – 0.057)
0.655 – 0.704 (0.026 – 0.028)
4
1.39 – 1.51 (0.055 – 0.059)
0.705 – 0.754 (0.028 – 0.030)
5
1.44 – 1.56 (0.057 – 0.061)
0.755 – 0.830 (0.030 – 0.033)
Содержание GRAND VITARA XL-7
Страница 285: ...ENGINE AND EMISSION CONTROL SYSTEM RHZ ENGINE 6E3 7 SYSTEM WIRING DIAGRAM For Vehicle Equipped with Single Connector ECM...
Страница 287: ...ENGINE AND EMISSION CONTROL SYSTEM RHZ ENGINE 6E3 9 For Vehicle Equipped with Triple Connector ECM...
Страница 521: ...7B1 116 AUTOMATIC TRANSMISSION 4 A T BEARING AND RACE INSTALLATION DIAGRAM...
Страница 597: ...Prepared by 1st Ed Feb 2002 Printed in Japan Printing 600...