background image

INSTALLATION INSTRUCTIONS

88-95 JEEP WRANGLER

TUBULAR STEP

PART#519952T

COMPONENTS

  2 - Front Mounting Brackets

  2 - Rear Mounting Brackets

  4 - “L” Shaped Brackets

  8 - 3/8 x 1 ½” Hex Head Bolt

  8 - 3/8” Nylock Nuts

16 - 3/8” USS Washers

  8 – ½ x 1 ½” Hex Head Bolts

  8 – ½” Nylock Nuts

16 – ½” SAE Washers

INSTALLATION

1.

The tube steps mount to the vehicle using a clamping system.  Figure 1 illustrates the front brackets on the passenger
side.  Position the mounting bracket against the frame and fasten using one of the ‘L’ brackets.  Use the 3/8” hardware to
mount the brackets.  Leave the brackets loose so they can be moved along the frame.

2.

Figure 2 shows the rear mounting brackets on the driver side.    Repeat step 1 to install the rear brackets.  Note: On the
driver side behind the frame run the brake lines, insert the  ‘L’ bracket between the frame and the brake line.
  

3.

Once the brackets have been installed.  Identify the steps and align with their respective brackets.  Use the ½” hardware to
fasten the steps.

4.

Align the steps to the desired position and tighten all bolts.  

5.

IMPORTANT: PLEASE MAKE SURE TO PERIODICALLY CHECK THAT ALL HARDWARE IS TIGHT.

Отзывы: