RUGGEDCOM ROX II
User Guide
Chapter 5
Setup and Configuration
Testing Link Failover
611
To launch a link failover test, do the following:
NOTE
The link failover test can be cancelled at any time. For more information about cancelling a link failover
Section 5.27.7, “Cancelling a Link Failover Test”
Cancelling the test returns the interfaces to their pre-test condition.
1. In normal mode or edit mode, navigate to
services
»
link-failover{interface id}
»
start-test
, where
{interface id}
is interface to be tested. The
Link Failover Test Settings
and
Trigger Action
forms appear.
1
2
Figure 714: Link Failover Test Settings Form
1.
Test Duration Box
2.
Start Test Delay Box
1
Figure 715: Trigger Action Form
1.
Perform Button
2. Configure the following parameter(s) as required:
Parameter
Description
test-duration
Default:
5
The amount of time (in minutes) to run before restoring service to the main trunk.
start-test-delay
Default:
1
The amount of waiting time (in minutes) before running the test.
3. On the
Trigger Action
form, click
Perform
to begin the test.
Содержание RUGGEDCOM RX1510
Страница 32: ...RUGGEDCOM ROX II User Guide Preface Customer Support xxxii ...
Страница 44: ...RUGGEDCOM ROX II User Guide Chapter 1 Introduction User Permissions 12 ...
Страница 62: ...RUGGEDCOM ROX II User Guide Chapter 2 Using ROX II Using the Command Line Interface 30 ...
Страница 268: ...RUGGEDCOM ROX II User Guide Chapter 4 System Administration Deleting a Scheduled Job 236 ...
Страница 852: ...RUGGEDCOM ROX II User Guide Chapter 5 Setup and Configuration Enabling Disabling an LDP Interface 820 ...