Getting Started With Autotest
CTS55
1094.0006.55 3.10
E-7
Status message
Callfrom: run
Step 7
Activity message
Please initiate a call from the mobile
2
DEF
3
GHI
1
ABC
5
6
4
8
ÜVW
7
STU
.
-
0
9
XYZ
S
C
RCL
M
Make a call from the mobile.
Status message
Callfrom :
The test step has been
successfully completed
---------------------------------------------------------------------------------
--------------------------------------------
Status messages
Avg. Pow 1: run
Avg. Pow 2: run
Avg. Pow 3: run
Step 8
While this status message is
displayed, the average trans-
mitter power of the mobile is
being measured.
Status messages
Avg. Pow 1: pass/fail
Avg. Pow 2: pass/fail
Avg. Pow 3: pass/fail
If the message "run" changes to
"pass", the measurement has
been successfully completed.
The result is within tolerances.
---------------------------------------------------------------------------------
--------------------------------------------
Status message
RxLev: run
RxQual: run
Step 9
In this next test step the RxLev
and RxQual of the mobile is
measured.
Status message
RxLev: pass
RxQual: pass
Measurement
completed.
The
result is within tolerances.
Содержание 1094.0006.50
Страница 4: ......
Страница 12: ......
Страница 22: ......
Страница 24: ......
Страница 26: ......
Страница 28: ......
Страница 30: ......
Страница 41: ...CTS55 Getting Started With Autotest 1094 0006 55 3 3 E 7...
Страница 66: ......
Страница 81: ...CTS55 Getting Started With Manual Test 1094 0006 55 6 7 E 6...
Страница 83: ...CTS55 Getting Started With Manual Test 1094 0006 55 6 9 E 6...
Страница 106: ......
Страница 108: ......
Страница 196: ......
Страница 246: ......
Страница 250: ......
Страница 253: ...CTS55 Index 1094 0006 55 I 3 E 8 V Viewing angle 2 3 Voltage selector 2 3 Voltage selector switch 2 2...
Страница 254: ......
Страница 256: ......
Страница 343: ...CTS K6 Windows Application CTSgo 1079 2001 01 87 E 3 Fig CTSgo help window...