3.6.2 Replacing CR Belt
94
3.6 Replacing Y Rail part
VJ628XE-M-00
9
Remove CR encoder cable from th clamps on
the path.
A : Clamp
B : Cable
C :
10
Remove the screws (3 pieces) retaining CR
Board Base to Cursor.
A : Pan-head screw with spring washer and
flat washer M3
x
6
B : CR Board Base
11
Remove CR Board Base from Cursor.
CAUTION
CR Board Base is removed while Steel
Bare etc. are attached.
As load should not be applied to Steel
bare etc. , place it on a bubble wrap.
A
B
B
A
12
Mark the position of CB belt tension adjusting
plate.
A : CR belt adjusting plate
B : Marking
13
Loosen the adjusting screw, and the loosen
tension of CR Belt.
A : Pan head small screw M4
x
30
B : CR Bel
14
Remove CR belt from CR motor.
A : CR belt
B : CR motor
15
Remove CR Return Pulley from Return Pulley
Base.
A : CR Return Pulley Assy
B : Return Pulley Base
B
A
A
B
A
B
A
B
A