3.6.11 Replacing CR Return Pulley Assy
105
3.6 Replacing Y Rail part
VJ628XE-M-00
3.6.11 Replacing CR Return Pulley Assy
●
Tools & Jigs & Maintenance part
NOTE
This section describes the procedure to replace the maintenance part,CR Return
Pulley Assy.In this section, it is referred to as CR Return Pulley.
Name
No.
Remarks
CR Return Pulley Assy
DF-49047
Exploded View Y Rail Assy
Phillips screwdriver No.2
Generic
products
-
Thread locker
Threebond 1401
1
Remove R Side Cover and L Side Cover.
2
Loosen the adjusting screw, and the loosen
tension of CR Belt.
A : Pan head small screw M4
x
30
B : CR Bel
3
Remove CR belt from CR motor.
A : CR belt
B : CR motor
B
A
B
A
4
Mark the position of CB belt tension adjusting
plate.
A : CR belt adjusting plate
B : Marking
5
Remove CR Return Pulley from Return Pulley
Base.
A : CR Return Pulley Assy
B : Return Pulley Base
6
Remove Bearing Holder (2 pieces) from CR
Return Pulley.
A : Bearing Holder
B : CR Return Pulley
7
Remove Return Pulley Axis from CR Return
Pulley.
A : Return Pulley Axis
B : CR Return Pulley
B
A
A
B
A
B
A
A
B
A