9 Messages
Maschinenfabrik Reinhausen GmbH 2019
360
5163667/06 EN
ETOS
®
IM
No.
Name
Description
Remedy
Q
1
1192
F1-C: Limit value ΔC1 >>
phase L2
The second limit value for the de-
viation in capacitance has been
exceeded for the bushing of
phase L2 in field 1.
Check field 1 capacitance
changes. If ∆C1 is greater than
10%, there is a risk of explosion.
Disconnect transformer from the
grid immediately. Use an external
measuring device to measure ca-
pacitance.
A
1193
F1-C: Limit value ΔC1 >>
phase L3
The second limit value for the de-
viation in capacitance has been
exceeded for the bushing of
phase L3 in field 1.
Check field 1 capacitance
changes. If ∆C1 is greater than
10%, there is a risk of explosion.
Disconnect transformer from the
grid immediately. Use an external
measuring device to measure ca-
pacitance.
A
1197
F1-C: Limit value ΔC1 >> mul-
tiple phases
The second limit value for the de-
viation in capacitance has been
exceeded for the bushings of mul-
tiple phases in field 1.
Check reference system and field
1 capacitance changes. If ∆C1 is
greater than 10%, there is a risk
of explosion. Disconnect trans-
former from the grid immediately.
Use an external measuring de-
vice to measure capacitance.
A
1201
IEC 61850: GOOSE commu-
nication defective
An error has occurred during
communication via IEC 61850-
GOOSE.
Check the GOOSE configuration
and IEC 61850 log.
-
1202
Motor running
"Motor running" signal present.
-
-
1203
F1: Bushing monitoring wiring
error
Bushing monitoring is not being
performed in field 1 due to a
wiring error.
Check the wiring of the bushing
coupling units and the reference
system in field 1.
-
1204
F1: Bushing monitoring refer-
ence voltage too low
Bushing monitoring not performed
in field 1 due to the reference
voltage being too low.
Check the reference system and
the wiring in field 1.
-
1205
F1-C: Measured voltage too
low
Capacitance monitoring not per-
formed in field 1 due to the volt-
age on the bushing coupling units
being too low.
Check the bushing coupling units,
the wiring, the bushings and the
transformer operating conditions
in field 1.
-
1206
F1-C: Standardization refer-
ence voltage invalid
Standardization of field 1 not per-
formed due to an invalid refer-
ence voltage measurement.
Check the reference system and
the wiring in field 1.
A
1207
F1-C: Standardization refer-
ence voltage too low
Standardization of field 1 not per-
formed due to the reference volt-
age being too low.
Check the reference system and
the wiring in field 1.
A
1208
F1-C: Standardization mea-
sured voltage invalid
Standardization of field 1 not per-
formed due to an invalid voltage
measurement on the bushing
coupling units.
Check the bushing coupling units,
the wiring, the bushings and the
transformer operating conditions
in field 1.
A
1209
F1-C: Standardization mea-
sured voltage too low
Standardization of field 1 not per-
formed due to the voltage on the
bushing coupling units being too
low.
Check the bushing coupling units,
the wiring, the bushings and the
transformer operating conditions
in field 1.
A
Содержание ETOS IM
Страница 1: ...Monitoring system ETOS IM Operating instructions 5163667 06 EN ...
Страница 410: ......
Страница 411: ......