
280
[Checking operation of outrigger interlock]
1. Install all four outriggers.
2. Press the mode switch (6) of the monitor or touch the
screen to enter the “crane mode”.
3. Move the operation lever on the right to the right
direction (rise) and raise the boom until the crane stowage
position lamp (1) of the monitor turns off.
4. Press the mode switch of the monitor or touch the
screen to enter the “outrigger mode”.
5. Press the mode switch (5) of the monitor or touch the
screen to enter the “contact” mode.
6. Press the mode switch (6) of the monitor or touch the
screen to enter the “manual” mode.
7. Turn the outrigger contact switch (7) on the outrigger
control panel to “In” position and make sure the
outrigger does not operate.
Содержание MC815C
Страница 2: ......
Страница 30: ...20 This Page Intentionally Left Blank...
Страница 73: ...63 3 Total load chart 106 2186300...
Страница 75: ...65 9 Precautions when using 106 2186600...
Страница 76: ...66...
Страница 82: ...72 This Page Intentionally Left Blank...
Страница 197: ...187 Remote control menu...
Страница 254: ...244 This Page Intentionally Left Blank...
Страница 314: ...304...
Страница 338: ...328 This Page Intentionally Left Blank...
Страница 343: ...333 2 SPECIFICATION DIMENSIONAL DRAWING...
Страница 344: ...334 3 DIMENSIONAL DRAWING OF OUTRIGGER WIDTH...
Страница 357: ...347 5 WORKING RADIUS LIFTING HEIGHT...
Страница 362: ...352 1 Diagram of fly jib working range chart 106 2189200...
Страница 397: ...387 9 4 WORKING RADIUS LIFTING HEIGHT...
Страница 398: ...388 This Page Intentionally Left Blank...
Страница 402: ...392 1 Searcher hook working range diagram 106 2189200...
Страница 403: ...393 6 Maximum rated total load 106 4716100 2 locations 7 Notice on pin holes CL000100001 2 locations...
Страница 424: ...414 9 4 WORKING RADIUS LIFTING HEIGHT...
Страница 426: ......