
137
2. OPERATION
2.1 PRE-OPERATION INSPECTION
Before starting the day’s work, perform the following checks:
For check items in the pre-operation inspection, refer to “INSPECTION AND MAINTENANCE 8.
MAINTENANCE AND INSPECTION LIST”.
2.1.1 VISIBLE CHECKS
Refer to “INSPECTION AND MAINTENANCE 9.1.1 CHECKING BEFORE STARTING ENGINE
(
VISUAL CHECKS)”.
2.1.2 CHECKING BEFORE STARTING ENGINE
Refer to “INSPECTION AND MAINTENANCE 9.1.2 CHECKING BEFORE STARTING ENGINE”.
2.1.3 INSPECTION AFTER STARTING ENGINE
Refer to “INSPECTION AND MAINTENANCE 9.1.4 CHECKING AFTER STARTING ENGINE”.
Содержание MC815C
Страница 2: ......
Страница 30: ...20 This Page Intentionally Left Blank...
Страница 73: ...63 3 Total load chart 106 2186300...
Страница 75: ...65 9 Precautions when using 106 2186600...
Страница 76: ...66...
Страница 82: ...72 This Page Intentionally Left Blank...
Страница 197: ...187 Remote control menu...
Страница 254: ...244 This Page Intentionally Left Blank...
Страница 314: ...304...
Страница 338: ...328 This Page Intentionally Left Blank...
Страница 343: ...333 2 SPECIFICATION DIMENSIONAL DRAWING...
Страница 344: ...334 3 DIMENSIONAL DRAWING OF OUTRIGGER WIDTH...
Страница 357: ...347 5 WORKING RADIUS LIFTING HEIGHT...
Страница 362: ...352 1 Diagram of fly jib working range chart 106 2189200...
Страница 397: ...387 9 4 WORKING RADIUS LIFTING HEIGHT...
Страница 398: ...388 This Page Intentionally Left Blank...
Страница 402: ...392 1 Searcher hook working range diagram 106 2189200...
Страница 403: ...393 6 Maximum rated total load 106 4716100 2 locations 7 Notice on pin holes CL000100001 2 locations...
Страница 424: ...414 9 4 WORKING RADIUS LIFTING HEIGHT...
Страница 426: ......