
278
9.1.4 INSPECTION AFTER STARTING ENGINE
Check the following in this section after starting the engine and before starting the work every
day.
CAUTION
The checkups described in this section should be carried out after starting the machine.
See “OPERATION 2.2 STARTING ENGINE” and later to execute the engine start up,
traveling operations, outrigger operations and crane operations.
[1] INSPECTION OF OUTRIGGER SAFETY EQUIPMENT OPERATION
[Checking operation of crane interlock]
1. Turn “ON” the starter switch.
2. Press the mode switch (1) of the monitor or touch
the screen to enter the “outrigger mode”.
3. Check that only the crane stowage position lamp
(1) of the monitor is eventually lit in green.
4. Insert the position pins (4) securely by rotating
outward the outrigger rotary of all four outriggers.
Check that all the extension lamps (2) of the
monitor are lit.
NOTES
After operating the outrigger rotary extension, make sure
that the position pins (4) are correctly inserted and
secured.
Содержание MC815C
Страница 2: ......
Страница 30: ...20 This Page Intentionally Left Blank...
Страница 73: ...63 3 Total load chart 106 2186300...
Страница 75: ...65 9 Precautions when using 106 2186600...
Страница 76: ...66...
Страница 82: ...72 This Page Intentionally Left Blank...
Страница 197: ...187 Remote control menu...
Страница 254: ...244 This Page Intentionally Left Blank...
Страница 314: ...304...
Страница 338: ...328 This Page Intentionally Left Blank...
Страница 343: ...333 2 SPECIFICATION DIMENSIONAL DRAWING...
Страница 344: ...334 3 DIMENSIONAL DRAWING OF OUTRIGGER WIDTH...
Страница 357: ...347 5 WORKING RADIUS LIFTING HEIGHT...
Страница 362: ...352 1 Diagram of fly jib working range chart 106 2189200...
Страница 397: ...387 9 4 WORKING RADIUS LIFTING HEIGHT...
Страница 398: ...388 This Page Intentionally Left Blank...
Страница 402: ...392 1 Searcher hook working range diagram 106 2189200...
Страница 403: ...393 6 Maximum rated total load 106 4716100 2 locations 7 Notice on pin holes CL000100001 2 locations...
Страница 424: ...414 9 4 WORKING RADIUS LIFTING HEIGHT...
Страница 426: ......